A/03Quality analysis & biomethane

Biomethane Purification and Upgrading

Biomethane Purification and Upgrading
Containerized · RED II · grid-ready

Complete, containerized biomethane purification and upgrading installations: CO₂ removal, drying, quality verification, odorization, pressure reduction, and fiscal measurement — ready for grid injection.

We supply biomethane upgrading as a single, tested package in a container enclosure: purification (CO₂ separation), drying, quality control (CH₄, CO₂, O₂, H₂S, Wobbe), odorization, and a grid injection node with fiscal measurement.

Wobbe index control and full compliance documentation for grid operator requirements and origin certification (RED II / ISCC-EU).

Capacity100 – 2,500 Nm³/h
Wobbe control± 0.2 MJ/m³
PurificationCO₂ separation
OdourisationTHT / TBM
Delivery18 – 22 wk
Biogas / biomethane plantsInjection into the distribution networkBiogas upgrading
RED IIISCC-EUEN 16723
P&IDAnatomia systemu

Jak projektujemy ciąg uzdatniania biometanu.

V‑201 BIOGAZ / INLET CH₄+CO₂ D‑201 ODSIARCZANIE H₂S CO₂ C‑202 SEPARACJA CO₂ H₂O DR‑203 OSUSZANIE AI 204 GC · WOBBE SAMPLE TAP OD‑205 NAWANIANIE THT FT FE‑206 POMIAR SIEĆ WTŁACZANIE / GRID FLOW ▸▸▸ BIOMETAN CH₄ > 95% · RED II · WOBBE ±0.2 MJ/m³
01 · Odsiarczanie

Usunięcie H₂S na złożu adsorpcyjnym chroni dalsze stopnie i spełnia limity sieciowe.

02 · Separacja CO₂

Membrany lub PSA podnoszą zawartość CH₄ powyżej 95 % — odprowadzenie CO₂ poza ciąg.

03 · Osuszanie i jakość

Osuszanie + kontrola Wobbego, CH₄, CO₂, O₂ i H₂S chromatografem online (RED II).

04 · Nawanianie i pomiar

Nawanianie THT/TBM oraz rozliczeniowy pomiar w węźle wtłaczania do sieci.