Home/ Products/ Biomethane Purification and Upgrading
A/03Quality analysis & biomethane

Biomethane Purification and Upgrading

Biomethane Purification and Upgrading
Containerized · RED II · grid-ready

Complete, containerized biomethane purification and upgrading installations: CO₂ removal, drying, quality verification, odorization, pressure reduction, and fiscal measurement — ready for grid injection.

We supply biomethane upgrading as a single, tested package in a container enclosure: purification (CO₂ separation), drying, quality control (CH₄, CO₂, O₂, H₂S, Wobbe), odorization, and a grid injection node with fiscal measurement.

Wobbe index control and full compliance documentation for grid operator requirements and origin certification (RED II / ISCC-EU).

Capacity100 – 2,500 Nm³/h
Wobbe control± 0.2 MJ/m³
PurificationCO₂ separation
OdourisationTHT / TBM
Delivery18 – 22 wk
Biogas / biomethane plantsInjection into the distribution networkBiogas upgrading
RED IIISCC-EUEN 16723
P&IDSystem anatomy

How we engineer a biomethane upgrading train.

V‑201 BIOGAS / INLET CH₄+CO₂ D‑201 H₂S REMOVAL CO₂ C‑202 CO₂ SEPARATION H₂O DR‑203 DRYING AI 204 GC · WOBBE SAMPLE TAP OD‑205 ODOURISATION THT FT FE‑206 METERING GRID GRID INJECTION FLOW ▸▸▸ BIOMETHANE CH₄ > 95% · RED II · WOBBE ±0.2 MJ/m³
01 · Desulphurisation

H₂S removal on an adsorption bed protects downstream stages and meets grid limits.

02 · CO₂ separation

Membranes or PSA raise CH₄ content above 95 % — CO₂ is vented off the train.

03 · Drying and quality

Drying + online gas chromatograph control of Wobbe index, CH₄, CO₂, O₂ and H₂S (RED II).

04 · Odourisation and metering

THT/TBM odourisation and fiscal metering at the grid injection point.