SYSTEM STATUS · 180+ STATIONS ON STREAM · ISO 9001 · ATEX · PED · MID
PL EN
Home/ Products/ Fuel Gas Conditioning Systems for CCGT
S/02Engineering systems

Fuel Gas Conditioning Systems for CCGT

Fuel Gas Conditioning Systems for CCGT
For turbines · dual-fuel · GT/EPC-ready

Complete fuel gas conditioning trains for combined-cycle and cogeneration plants: filter-coalescer, gas heater, fiscal measurement, pressure reduction, and ESD — sized for Siemens, GE, and MAN turbines.

We design fuel gas preparation trains for the specific turbine: ensuring the required superheat, cleanliness, and pressure stability of the fuel at the GT inlet.

ESD and F&G logic fully tested at FAT, HAZOP-cleared documentation, ready for EPC integration.

Capacityup to 120,000 Nm³/h
Inlet pressureup to 8.4 MPa
Superheat+20 K min.
StandardEN 1776 · API 6D
Combined-cycle gas turbine (CCGT) plantsCogenerationCombined heat and power plants
EN 1776API 6DIEC 61511 (SIL)
P&IDSystem anatomy

How we engineer a CCGT fuel gas conditioning train.

V‑101 GATE VALVE / INLET 8.4 MPa F‑101 FILTER / COALESCER FT FE‑102 USM METER PCV‑103 REGULATOR E‑104 PERF. HEATER · +20K AI 105 GC SAMPLE TAP S SDV‑106 EMERG. SHUTDOWN GT TURBINE SIEMENS / GE / MAN FLOW ▸▸▸ CH₄ CH CO CO₂ N₂ — CCGT FUEL, 8.4 MPa @ INLET, 2.7 MPa @ GT
01 · Inlet conditioning

Double block-and-bleed, filter-coalescer to 99.98 % at 0.3 µm, slam-shut on low pressure.

02 · Fiscal measurement

Ultrasonic meter with EVC and redundant pressure / temperature — AGA-9 compliant, ± 0.5 % class.

03 · Conditioning

Monitor/active regulation + electric or water-glycol superheat to +20 K above dew point.

04 · Protection

SIL-rated ESD valve, F&G detection, 2oo3 voting, MOC per IEC 61511 — signed off in FAT.